ENBRA - Ingeniería en Automatización y Seguridad Industrial

ENBRA · 01 · Compliance

Machine Safety

Functional safety services for industrial machinery under European standards.

EN ISO 12100:2010 · EN ISO 13849-1:2015 · EN 62061:2021 · Directive 2006/42/EC

ENBRA · Servicios

Scroll ↓

01 — Alcance

Specialised services

Full lifecycle coverage for your machinery — from initial assessment through certification.

02 — Método

Our process

Structured methodology for regulatory compliance and optimised safety systems.

  1. 01

    Initial analysis

    Machinery, processes and applicable standards.

  2. 02

    Technical assessment

    Hazard identification and quantitative risk evaluation.

  3. 03

    Implementation

    Design and deployment of safety measures.

  4. 04

    Validation

    Full verification and compliance documentation.

03 — Criterios

Why ENBRA

Regulatory framework

  • EN ISO 12100:2010 — Risk assessment and reduction
  • EN ISO 13849-1:2015 — Safety-related control systems
  • EN 62061:2021 — Electrical/electronic functional safety

Sectors

  • Automotive
  • Food & beverage
  • Pharmaceutical
  • Critical infrastructure
  • Packaging

Assurances

  • Documented regulatory compliance
  • Complete technical documentation
  • Post-delivery support
  • Certified technical expertise

FAQ

Preguntas frecuentes

Respuestas técnicas frecuentes sobre este servicio.

01

Which standards does the machine safety service cover?

We primarily work with EN ISO 12100, EN ISO 13849, IEC 62061 and the European machinery framework (Directive 2006/42/EC and Regulation EU 2023/1230), plus national rules for machinery in service where applicable.

02

Can you upgrade machinery already installed on site?

Yes. We assess existing lines, prioritise gaps and propose an upgrade plan compatible with production and maintenance.

03

What deliverables do I receive?

Risk assessment reports, PL/PLr calculations where applicable, validation documentation and a technical file oriented to conformity and audit.

04

How long does a typical project take?

It depends on scope: a focused assessment can be completed in a few weeks; a full line or multi-point upgrade plan usually requires several planned phases.

Siguiente paso

Cuéntanos el alcance

Te respondemos con una propuesta técnica adaptada a tu planta. Sin compromiso.